Project Management

Optima’s Project management is one of our strongest attributes. Upgrading machines is a complicated business and is seen to carry a high degree of risk; and it’s no wonder. Taking a key production machine out of service, completely changing the control system for a new, bespoke system with modern technology, often with mechanical modifications too, then putting it back into production within a fixed downtime period is risky. We have a 100% success rate…

Optima Control Solutions Ltd. have carried out many hundreds of control system upgrades since 1995, in numerous sectors and with values ranging from low £1,000’s to over £500,000.

Our success in this field is no co-incidence. When customers engage Optima they employ a professional company who’s aim is to deliver our engineering expertise working as an integral part of our customers’ project teams. Technical expertise and a will to succeed achieve maximum effect when combined with competent and pragmatic project management.

Mutual professional respect is essential when co-ordinating, directing and handling sub-contractors. Good working partnerships rely on all parties having appropriate competence, industrial experience and budget and timescale focus. This recognition and careful selection of suppliers accounts for our achievements and our exemplary customer retention record.

Recent Posts

Drive System Retrofit for MasterDrives

Because of their superior functionality, comprehensive performance range and application flexibility, the Siemens Simovert MASTERDRIVES in CUVC, CUMC, Compact form and other variants has been a very successful drive system for single motor and multi-motor applications. The established common DC bus system enabled it to be used on demanding production machine processes across a wide range of industry sectors.

All good things must come to an end, but that doesn’t mean the end of the line for your production machine.

Optima’s innovative approach to upgrades significantly reduces the installation time and minimises risk to your site. All of our systems are thoroughly tested before they are shipped to site, completely eliminating any “out of box” failures.

Some of the benefits you will realise are:

  • Extended life span of your machine and increased availability due to continued spare parts supply with full support by Siemens
  • Improved productivity through lower energy costs and faster production cycles, through:
    • Simple operation monitoring using operator panel
    • User-friendly diagnostics with the STARTER tool
    • Additional interface options via PROFINET or PROFIBUS
  • Future-proofed due to access to the new world of TIA Portal

Optima’s approach for upgrades is to:

  1. 1.Analysis of your current machine configuration and potential further customer request
  2. Recommendation on the best replacement scenario
  3. Installation, configuration and commissioning of new  components and creation of circuit diagram and documentation
  4. Acceptance test and machine handover.

If requested, we can also provide training for all your relevant engineers and instruction of the operating personnel

Why Optima?

  1. We’ve been upgrading complex drive systems for over 20 years
  2. We are one of only 7 authorised Siemens Drives and Motion partners in the UK
  3. We provide a complete solution provided by one retrofit supplier including mechanical installation of motors and/or supply of adaptor plates and flanges to suit
  1. Don’t replace old for old. Replace old for new at a similar cost (including conversion) Leave a reply
  2. Weekend shutdown sees pump system upgraded to latest Siemens Sinamics drives and S7-1200 PLC Leave a reply
  3. First Batch of UL-Control Panels Finished and ready for shipping to the USA Leave a reply
  4. Improved Performance And Reliability Following Upgrade From Hydraulic Motors To AC Geared Motors Leave a reply
  5. Government Launches it’s “Made Smarter” Review 2017 Leave a reply
  6. Pepperl+Fuchs Innovation Tour arrives at Optima on the 14 November from 11.00 – 14.00 Leave a reply
  7. Automax and PLC 5 to PowerFlex Drives and Control Logix Upgrade on Metalliser Leave a reply
  8. Optima’s upgrade solution for a Sirpak 200 cut-to-length Machine system reduces waste by 9km per week Leave a reply
  9. Metal Decorating Press Upgrade using Siemens Simotion S120 + D425 controller + Simatic S7 PLC Leave a reply