Clients

Below is a selection of the companies Optima has worked with.

 

3M logoAkzo Nobel logoAmcor logo

Arjo Wiggins logoArla Foods logoArmacell logo

Bobst Group logo     Bridonmn-chesapeake Corus logo

Cott BeveragesCrown logoDiageo

DS Smith logoDunlop logoDuPont logo

Formica Laminates logoGlatfelter logoHabasit Rossi logo

Haribo logoHeinz logoJames Cropper logo

Kingspan logoKodak Polychrome Graphics logoLinpac logo

Outokumpu logoProcess Line logoPrint Pack logo

Sandusky logoSmith&Nephew logoSoreen logo

Tensar International logoTullis Russell logoUPM logo

Voith logoWarburtons logo

Recent Posts

Up to 5 Years Warranty as Standard on our Motor and Drive Upgrades with Siemens

As a trusted Siemens Drive and Motion Partner, any machine upgrade that Optima engineer that uses Siemens Drives and Motors, Siemens will provide a 5 year warranty on the drive and 3 years on the motor/ motor gearbox Free of Charge. Optima can also extend this standard warranty further for you at preferential rates as a trusted partner of Siemens. See the below link for more information:

https://new.siemens.com/uk/en/products/drives/extended-warranty-packages.html

To be accepted as a Solution Partner of the “Drives & Motion” arm of Siemens, Optima must fulfill the following qualification criteria:

  • A proven track record of many years of experience in implementing projects in drive systems engineering using Siemens components
  • Qualified management our own projects, configuration and quality
  • Regular auditing of partner performance by Siemens Automation and Drives
  1. Optima achieve accreditation by Avetta for supplier competency Leave a Reply
  2. Re-commencement of commissioning on major projects Leave a Reply
  3. All the support you need… when you need it Leave a Reply
  4. Supply of Motor Generator Test Rigs to Blackpool & The Fylde College Leave a Reply
  5. 25% Production Improvement from Loadcell Upgrade Leave a Reply
  6. PanelView HMI Upgrades Leave a Reply
  7. Safety Control System Upgrade Leave a Reply
  8. Completion of Large Motor Test Rigs Leave a Reply
  9. Bespoke Welding Machines’ Seam-Less Upgrade From S5 To Tia Portal Leave a Reply