Turnkey Solutions

We are pleased to offer turnkey solutions to our clients. Depending upon the client’s brief and the project scope we very often manage the full project, including mechanical engineering and electrical installation. We have select sub-contract companies with whom we work regularly. Alternatively, we will readily work with customer-nominated third parties.

Our project management skills and application experience are valuable assets in this discipline.

On any project the facilities that Optima Control Solutions Ltd. provide are:

  •   Produce a detailed line control specification document
  •   Produce high quality CAD drawings
  •   Manufacture and functionally test your control cubicles.
  •   Ship the cubicles to your site
  •   Installation of the control cubicles (optional)
  •   Commissioning of the line control system
  •   Issue a fully documented User Manual
  •   Maintain a record of your drawings
  •   Provide an expert support service
  •   Equipment Installation.

Need more information? Browse various projects here. Our industry-specific pages also provide details about the control system projects we have completed over the years.

Recent Posts

  1. Drive System Retrofit for MasterDrives Leave a reply
  2. Don’t replace old for old. Replace old for new at a similar cost (including conversion) Leave a reply
  3. Weekend shutdown sees pump system upgraded to latest Siemens Sinamics drives and S7-1200 PLC Leave a reply
  4. First Batch of UL-Control Panels Finished and ready for shipping to the USA Leave a reply
  5. Improved Performance And Reliability Following Upgrade From Hydraulic Motors To AC Geared Motors Leave a reply
  6. Government Launches it’s “Made Smarter” Review 2017 Leave a reply
  7. Pepperl+Fuchs Innovation Tour arrives at Optima on the 14 November from 11.00 – 14.00 Leave a reply
  8. Automax and PLC 5 to PowerFlex Drives and Control Logix Upgrade on Metalliser Leave a reply
  9. Optima’s upgrade solution for a Sirpak 200 cut-to-length Machine system reduces waste by 9km per week Leave a reply