Electrical Engineering

Applying control technology to automated machinery needs a range of technical skills. Good electrical engineering ensures it’s safety, reliability and longevity.

Our engineers design control systems with electrical and electronic equipment switching and controlling powers rated from milli-watts to megawatts. In the work we undertake the consequences of poor electrical engineering can be catastrophic. To ensure the high quality of engineering that is necessary we operate a design procedure regime that ensures good engineering practise on every project and encourages our engineers to be disciplined both technically and procedurally. With competent peer checking mechanisms and pre-approved component sizing techniques we guarantee our designs are good.

Using EN60204-1 design standards means that clients get consistency in there interfaces and documentation. If however our clients have their own site or corporate engineering standards we readily accommodate them.

Need more information? Browse various projects here. Our industry-specific pages also provide details about the control system projects we have completed over the years.

Recent Posts

S88 Solution Solves Obsolescence Issue

Addressing obsolescence is an issue facing many companies and failure to create a robust action plan can often lead to problems that not only affect the operation of a line or machine, but can also result in unfavourable issues that could have detrimental effects on quality levels and brands.

The dangers of obsolescence were identified early on at a leading British biscuit manufacturer in its mixing plant, where older hardware was not only showing its age in terms of performance and failures, but was also no longer part of a supported spares package. More information can be found here: Rockwell Automation Case Study

More information here:

Allen‑Bradley ControlLogix programmable automation controllers

EtherNet/IP device-level ring network topology

Batch servers

Rockwell Automation integrated-display computer running FactoryTalk View Site Edition (SE)

Rockwell Software FactoryTalk Batch software solution

  1. Up to 5 Years Warranty as Standard on our Motor and Drive Upgrades with Siemens Leave a Reply
  2. Optima achieve accreditation by Avetta for supplier competency Leave a Reply
  3. Re-commencement of commissioning on major projects Leave a Reply
  4. All the support you need… when you need it Leave a Reply
  5. Supply of Motor Generator Test Rigs to Blackpool & The Fylde College Leave a Reply
  6. 25% Production Improvement from Loadcell Upgrade Leave a Reply
  7. PanelView HMI Upgrades Leave a Reply
  8. Safety Control System Upgrade Leave a Reply
  9. Completion of Large Motor Test Rigs Leave a Reply