Breakdown Response

“Strength in depth” – all winning teams have it.

One of the major benefits that we offer our clients is directly related to our engineering team’s size and competence.

We know that when our clients’ plant fails, time is money. We understand the extreme pressures that go with manufacturing – and we respond.

Our numbers, our expertise and our willingness to get clients going again make us a powerful breakdown resource and our clients recognise it.

Click here to see a recent record of our breakdown services.

Recent Posts

S88 Solution Solves Obsolescence Issue

Addressing obsolescence is an issue facing many companies and failure to create a robust action plan can often lead to problems that not only affect the operation of a line or machine, but can also result in unfavourable issues that could have detrimental effects on quality levels and brands.

The dangers of obsolescence were identified early on at a leading British biscuit manufacturer in its mixing plant, where older hardware was not only showing its age in terms of performance and failures, but was also no longer part of a supported spares package. More information can be found here: Rockwell Automation Case Study

More information here:

Allen‑Bradley ControlLogix programmable automation controllers

EtherNet/IP device-level ring network topology

Batch servers

Rockwell Automation integrated-display computer running FactoryTalk View Site Edition (SE)

Rockwell Software FactoryTalk Batch software solution

  1. Up to 5 Years Warranty as Standard on our Motor and Drive Upgrades with Siemens Leave a Reply
  2. Optima achieve accreditation by Avetta for supplier competency Leave a Reply
  3. Re-commencement of commissioning on major projects Leave a Reply
  4. All the support you need… when you need it Leave a Reply
  5. Supply of Motor Generator Test Rigs to Blackpool & The Fylde College Leave a Reply
  6. 25% Production Improvement from Loadcell Upgrade Leave a Reply
  7. PanelView HMI Upgrades Leave a Reply
  8. Safety Control System Upgrade Leave a Reply
  9. Completion of Large Motor Test Rigs Leave a Reply